How often to refill a cryocan with liquid nitrogen
UPADI · Published · 4 sources
Direct answer: days until refill = (litres of nitrogen now − litres you must keep as a minimum) ÷ litres lost per day. The holding time printed for a cryocan is the static figure, roughly capacity ÷ evaporation rate for a closed, unused can. Real use loses nitrogen faster, so plan with your own measured daily loss.
The two numbers on every datasheet
| Term | Meaning | Example |
|---|---|---|
| Static evaporation rate | Litres lost per day by a full, closed can standing still | MVE XC 20: 0.090 L/day (MVE spec sheet) |
| Static holding time | Days a full, closed can takes to boil dry | 20.5 L ÷ 0.090 L/day ≈ 228 days (our arithmetic from the same sheet) |
| Working duration | Expected days under normal use | MVE XC 20: 142 days (MVE spec sheet) |
MVE says both its static figures are "nominal" and that actual figures are "affected by the nature of container use, atmospheric conditions, and manufacturing tolerances" (MVE spec sheet). Its manual adds that handling inventory and accessories, and vibration, "will decrease the working duration" (MVE manual).
How big is the gap?
Dividing capacity by evaporation rate for MVE's three XC animal health models, and comparing with the working duration on the same sheet:
| MVE model | Capacity (L) | Static rate (L/day) | Capacity ÷ rate (days) | Working duration (days) | Working as % of static |
|---|---|---|---|---|---|
| XC 20 | 20.5 | 0.090 | 228 | 142 | 62% |
| XC 34/18 | 34.8 | 0.18 | 193 | 123 | 64% |
| XC 47/11-6 | 47.4 | 0.39 | 122 | 76 | 63% |
Source: MVE spec sheet; the last two columns are our arithmetic. This is one manufacturer's reference for "normal" use, not a rule for every can. A field can opened many times a day will do worse; a store can opened once a week may do better.
Measure your own loss
The DAHD SoP asks AI centres to measure 35 litre containers weekly and keep a record "to monitor its evaporation rate". That record is the best planning number you have.
- Measure with a wooden or plastic dipstick and read the frost line (Semex).
- Convert the height to litres using the chart or ruler supplied with your container.
- Daily loss = (last week's litres − this week's litres) ÷ 7.
If the weekly loss suddenly rises with no change in use, check the can for vacuum loss; see cryocan care and maintenance.
Worked example
A centre has a BA-35. Its product page lists 33.3 L capacity, 0.30 L/day evaporation and 111 days holding time. That matches the formula: 33.3 ÷ 0.30 = 111 days static.
The technician's register shows these readings (an illustration, not a measured case):
| Date | Reading (L) |
|---|---|
| Week 1 | 30.0 |
| Week 2 | 27.2 |
- Daily loss = (30.0 − 27.2) ÷ 7 = 0.40 L/day, a third more than the static 0.30.
- The centre decides it must never fall below 8 L, so the canisters stay well covered. (Set this from your own can: the SoP's rule is that the level stays above the straws.)
- Days left before refill = (27.2 − 8) ÷ 0.40 = 48 days.
- Litres to order at that point = 33.3 − 8 = 25.3 L.
- Cost = 25.3 L × your local rate per litre. We found no authoritative national price, so use the rate on your supplier's bill.
Order with a margin: if your supplier comes once a month, refill when about a month of nitrogen is still left, not on the last day.
Field cans
A 1.5 to 3 litre field can has only a few litres to spare, and it is opened at every farm. Check it each time you return to the centre, and top it up before each round. The SoP rule is the same: keep the level above the straws (DAHD SoP).
Ways to make nitrogen last longer
- Keep the lid on between uses. Semex notes an open tank "will not go dry, but increased nitrogen gasification will result" (Semex).
- Keep a semen inventory so you find straws quickly (DAHD SoP).
- Keep the can out of the sun and off bare concrete (Semex).
- Avoid knocks and vibration (MVE manual).
Calculator
The LN2 holding time and refill calculator on this page uses the same formula. Enter the capacity and evaporation rate from your datasheet, your current reading, your minimum level and, if you have it, your measured daily loss. Specs for UPADI models with consistent data are in the cryocan size guide.
Related: how long semen lasts in a cryocan, liquid nitrogen safety.
LN2 holding time and refill calculator
Work out your daily loss from two readings
Enter the capacity and the evaporation rate.
- Static figures on datasheets are nominal for a closed, unused container; real loss is higher with opening, lifting canisters, vibration, heat and age (MVE spec sheet and manual).
- UPADI catalogue specs are pending confirmation against manufacturer datasheets.
- The planning factor is derived from one manufacturer's published working durations; a measured weekly loss always overrides it.
- The calculator does not convert dipstick centimetres to litres; container geometry differs. Use the chart supplied with the container.
- Never let the level fall below the straws (DAHD SoP). Rising loss with unchanged use can mean vacuum failure; move semen at once.
- No LN2 price is built in.
Model figures: cryocan size guide
Questions and answers
How do I calculate how long liquid nitrogen will last in my cryocan?
Divide the litres of nitrogen above your safe minimum level by the litres lost per day. Use your own measured daily loss if you have it; the catalogue evaporation figure is for a closed, unused can and gives too many days.
Why does my cryocan run out faster than the holding time on the label?
The label gives static holding time for a closed can. Opening the lid, lifting canisters, vibration and heat all add to the loss. MVE's own spec sheet lists working durations of roughly 62 to 64 percent of the static figure for its XC models.
What is the liquid nitrogen price per litre?
We found no authoritative national price. It depends on your supplier and district, so the calculator asks you to enter your local rate.
Sources
- MVE XC Series Animal Health Spec Sheet (ML-000020 Rev 0), MVE Biological Solutions (accessed 2026-11-19)
- Operating Manual for MVE Liquid Nitrogen Dewars (11624417 Rev T), Chart Inc. (MVE) (accessed 2026-11-19)
- Standard operating procedures for Artificial Insemination Technicians / MAITRIs (OM dated 24 January 2026), Department of Animal Husbandry and Dairying, Government of India (hosted by Odisha DAHVS) (accessed 2026-11-19)
- Semen Tank Management: A Dozen Do's and a Few Don'ts, Semex (article by Bruce Poulin, Progressive Dairyman) (accessed 2026-11-19)